Home / LV Power
LV Power

LV power distribution for energy and industrial sites.

Containment, cabling and terminations for the electrical infrastructure behind generation and process plant, carried out by the same organised team that delivers our solar work.

What we do

Heavy containment, cable runs and switchgear connections

On larger sites the critical path often runs through the cable routes. We install long runs of ladder, tray and basket, pull and dress heavy multi-core cables, and make the terminations at switchgear and distribution boards.

  • Cable ladder, tray and basket containment, at high level and in cable troughs
  • LV cable installation and dressing
  • Terminations at switchgear, distribution panels and isolators
  • AC mains packages, including connections to G99/G100 units on PV sites
  • Inspection and testing to BS 7671
Cable installation in concrete troughs on an energy siteCable routes, HyMarnham
On site

Recent LV power work

Cable ladder and cables in the concrete troughs · HyMarnham Power
Cable ladder and cables in the concrete troughs · HyMarnham Power
LV switchgear with isolators padlocked off · HyMarnham Power
LV switchgear with isolators padlocked off · HyMarnham Power
Cables formed through a trough junction · HyMarnham Power
Cables formed through a trough junction · HyMarnham Power
Ladder rack carrying large AC cables at high level · Coldstar Refrigeration
Ladder rack carrying large AC cables at high level · Coldstar Refrigeration
LV switchboard: incoming cables terminated in the open section, ACB below and padlocked outgoing switches · Coldstar Refrigeration
LV switchboard: incoming cables terminated in the open section, ACB below and padlocked outgoing switches · Coldstar Refrigeration
Control panel wiring · HyMarnham Power
Control panel wiring · HyMarnham Power
Qualified team

Qualified and carded

NVQ Level 3 ElectrotechnicalL3 Initial VerificationL3 Periodic Inspection & TestingCDM RegulationsIPAF 3a/3bPASMACCNSG Safety PassportConfined SpacesFirst Aid at Work
Planning a commercial solar project from 100kWp upward?

Let’s talk programme and scope.

Send us your PV drawings, system size and dates. We’ll come back with a clear, fixed labour-only price per kW.