LV PowerLV power distribution for energy and industrial sites.
Containment, cabling and terminations for the electrical infrastructure behind generation and process plant, carried out by the same organised team that delivers our solar work.
What we do
Heavy containment, cable runs and switchgear connections
On larger sites the critical path often runs through the cable routes. We install long runs of ladder, tray and basket, pull and dress heavy multi-core cables, and make the terminations at switchgear and distribution boards.
- Cable ladder, tray and basket containment, at high level and in cable troughs
- LV cable installation and dressing
- Terminations at switchgear, distribution panels and isolators
- AC mains packages, including connections to G99/G100 units on PV sites
- Inspection and testing to BS 7671