Home / Projects / Brookenby Solar Farm, Binbrook
Project 02 · Solar PV

Brookenby Solar Farm, Binbrook

Solar PV · 350kW ground-mounted PV system

Site typeGround-mount solar farm
ServiceSolar PV
LocationBrookenby, Lincs
System size350kW
Our scope350kW ground-mounted PV system, plus cable installation up to the point of final connection

A 350kW ground-mounted solar PV system at Brookenby, near Binbrook in Lincolnshire. MTM installed the PV system, from mounting frames and modules to the inverters and AC terminations, and installed the cable up to the point of final connection.

Mounting frames being assembled on site
Mounting frames being assembled on site
Module row at sunset
Module row at sunset
Solis inverter mounted beneath the array
Solis inverter mounted beneath the array

PV installation

The 350kW ground-mounted array, from the mounting frames going in to completed module rows, with the inverters mounted beneath the tables.

Rear of the completed module tables
Rear of the completed module tables
Rows of mounting frames ready for modules
Rows of mounting frames ready for modules
AC terminations at the Solis inverter
AC terminations at the Solis inverter
Completed module rows
Completed module rows
Module installation along a row
Module installation along a row

Cable route installation

The cable was installed up to the point of final connection, with the route taken by directional drilling, trenching and ducting.

Directional drilling rig on the cable route
Directional drilling rig on the cable route
Ducting laid in the cable trench
Ducting laid in the cable trench
Excavating along the cable route
Excavating along the cable route
Ducting for the cable route
Ducting for the cable route
Open trench along the cable route
Open trench along the cable route
Duct with draw rope in the trench
Duct with draw rope in the trench
Cable trench along a verge
Cable trench along a verge
Planning a commercial solar project from 100kWp upward?

Let’s talk programme and scope.

Send us your PV drawings, system size and dates. We’ll come back with a clear, fixed labour-only price per kW.